NAVFAC Awards $10.6 Million Contract for F-35 Deployment Storage Facility at NAS JRB Fort Worth

News originally published by

DVIDS - Georgia

Naval Facilities Engineering Systems Command awarded a $10.6 million contract Nov. 17 to P & S Construction Inc., of Westford, Massachusetts, to construct a new F-35 deployment storage facility and logistics warehouse at Naval Air Station Joint Reserve Base Fort Worth, Texas.

The project delivers a dedicated operational facility for the Air Force Reserve Command’s 301st Fighter Wing, ensuring the unit possesses the logistical infrastructure needed to rapidly stage, equip, and deploy fifth-generation air assets worldwide.

"This new facility is all about speed and operational readiness. Rather than moving gear across outdated buildings scattered throughout the base, our teams will now have a single, dedicated hub to stage their equipment," said Lt. Jacob Haack, resident officer in charge of construction, NAS JRB Fort Worth. "This is the modern infrastructure our joint warfighters need to project F-35 airpower anywhere in the world at a moment's notice."

This project funds the construction of a state-of-the-art, 25,775-gross-square-foot logistics facility designed to streamline operations by consolidating vital mobility equipment and F-35 deployable aircraft parts under one roof. Engineered to support high-tempo operations, the new hub features advanced loading and unloading docks, dedicated parking, and pedestrian walkways. To ensure seamless, 24/7 functionality, the site will be built with comprehensive utility support systems and reinforced roadway access specifically designed to handle heavy military vehicle transit.

Additionally, the project includes the demolition of Building 1229, an existing 20,656-square-foot facility erected in 1942, eliminating maintenance costs and modernizing the base layout.

The requirement was competitively procured via the 2022 East Multiple Award Construction Contract, with three offers received. Fiscal 2027 Operation and Maintenance (Air Force) funds in the amount of $10.6 million are obligated at the time of award.

Work is slated for completion by May 10, 2028.

About Naval Facilities Engineering Systems Command

Naval Facilities Engineering Systems Command is the naval shore facilities, base operating support, and expeditionary engineering systems command that delivers life-cycle technical and acquisition solutions aligned to fleet and Marine Corps priorities.

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Share this page:

Advanced Search Options

Search for:

Search scope:

Type:

Search in:

Date range:

The last

Sort by:

Sign up for:

Military Press Releases

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.